Line 4 of the Changsha Metro (Chinese: 长沙地铁四号线; pinyin: Chǎngshā Dìtiě Sì Hào Xiàn) is a rapid transit line in Changsha. It began trial operations without passengers on 29 December 2018. The line opened on 26 May 2019 with 25 stations.

Property Value
dbo:abstract
  • Line 4 of the Changsha Metro (Chinese: 长沙地铁四号线; pinyin: Chǎngshā Dìtiě Sì Hào Xiàn) is a rapid transit line in Changsha. It began trial operations without passengers on 29 December 2018. The line opened on 26 May 2019 with 25 stations. (en)
dbo:isPartOf
dbo:lineLength
  • 33500.000000 (xsd:double)
dbo:location
dbo:numberOfStations
  • 25 (xsd:integer)
dbo:openingDate
  • 2019-05-26 (xsd:date)
dbo:openingYear
  • 2019-01-01 (xsd:date)
dbo:operator
dbo:owner
dbo:status
  • Operational
  • Under construction
dbo:type
dbo:wikiPageEditLink
dbo:wikiPageExtracted
  • 2019-04-20 15:33:31Z (xsd:date)
  • 2019-04-20 15:40:23Z (xsd:date)
  • 2019-04-20 15:53:06Z (xsd:date)
  • 2019-04-20 16:06:33Z (xsd:date)
  • 2019-04-20 16:12:47Z (xsd:date)
  • 2019-04-20 16:19:06Z (xsd:date)
  • 2019-05-27 14:03:04Z (xsd:date)
dbo:wikiPageHistoryLink
dbo:wikiPageID
  • 60543466 (xsd:integer)
dbo:wikiPageLength
  • 2399 (xsd:integer)
  • 3114 (xsd:integer)
  • 4032 (xsd:integer)
  • 4070 (xsd:integer)
  • 4259 (xsd:integer)
  • 4618 (xsd:integer)
dbo:wikiPageModified
  • 2019-04-20 15:29:55Z (xsd:date)
  • 2019-04-20 15:38:45Z (xsd:date)
  • 2019-04-20 15:50:29Z (xsd:date)
  • 2019-04-20 16:05:24Z (xsd:date)
  • 2019-04-20 16:09:32Z (xsd:date)
  • 2019-05-27 14:02:43Z (xsd:date)
dbo:wikiPageOutDegree
  • 11 (xsd:integer)
  • 12 (xsd:integer)
  • 14 (xsd:integer)
dbo:wikiPageRevisionID
  • 893321643 (xsd:integer)
  • 893322635 (xsd:integer)
  • 893323884 (xsd:integer)
  • 893325651 (xsd:integer)
  • 893326099 (xsd:integer)
  • 899039427 (xsd:integer)
dbo:wikiPageRevisionLink
dbp:character
  • Underground (en)
dbp:mapState
  • collapsed (en)
dbp:open
  • 2019 (xsd:integer)
dbp:owner
  • Changsha Government (en)
dbp:p
  • Chǎngshā Dìtiě Sì Hào Xiàn (en)
dbp:routes
  • 1 (xsd:integer)
dbp:s
  • 长沙地铁四号线 (en)
dbp:stations
  • 25 (xsd:integer)
dbp:status
  • Under construction (en)
dbp:stock
  • 6 (xsd:integer)
dbp:tracks
  • 2 (xsd:integer)
dbp:wikiPageUsesTemplate
dct:subject
rdf:type
rdfs:comment
  • Line 4 of the Changsha Metro (Chinese: 长沙地铁四号线; pinyin: Chǎngshā Dìtiě Sì Hào Xiàn) is a rapid transit line in Changsha. It began trial operations without passengers on 29 December 2018. The line opened on 26 May 2019 with 25 stations. (en)
rdfs:label
  • Line 4 (Changsha Metro) (en)
foaf:isPrimaryTopicOf
owl:sameAs
is dbo:servingRailwayLine of
is dbo:wikiPageDisambiguates of
is foaf:primaryTopic of